Triple Wides

Triple Wide A

Round
26′ width x 31′ length x 9′ height
Extra Braces

Triple Wide B

Round
30′ width x 51′ length x 12′ height
(1) End Partially Closed
(2) Sides Partially Closed
Extra Braces


Triple Wide C

Round
26′ width x 36′ length x 10′ height
(2) Extra Panels
Extra Braces

Triple Wide D

Round
30′ width x 50′ length x 12′ height
(1) End Closed
(2) Sides Closed
Extra Braces


Triple Wide E

A-frame Vertical
30′ width x 70′ length x 14′ height
(1) Side Closed
(2) Bay Openings
(1) Extra Panel
Extra Braces

Triple Wide F

A-frame Vertical
30′ width x 40′ length x 12′ height
(1) Vertical End Enclosed
(1) Vertical Side Enclosed
Extra Braces

Customer Testimonials

Just wanted to thank you guys for doing a fantastic job. The installers were in and out. They made sure everything was done right before heading out. I’m very pleased with my new garage. Keep up the good work! – Glass

Guys came did a fantastic job. Worked fast and efficiently. Wanted to thank you personally nice doing business with you. – Frank

Thank you very much, the guys did a great job. Very nice and very fast! Thank you again! – Dennis

Office Hours

Monday………… 8:30am – 5:00pm
Tuesday……….. 8:30am – 5:00pm
Wednesday…… 8:30am – 5:00pm
Thursday……… 8:30am – 5:00pm
Friday………….. 8:30am – 5:00pm
Saturday…….. 8:30am – 12:30pm

Site Preparation

Site preparation is very important for a good installation. As a reminder we are not responsible for any site prep. Below are a few steps that will help with building install:

Check for underground lines, where anchoring will take place.

Land must be squared and leveled. Call for more details.

Minimum workspace of 2 ft around entire structure.

When overhead power lines are involved, a minimum of 10 ft is needed or power lines must be completely shut off.