Utility Rooms

Utility Building A

A-frame Vertical
Room: 12′ width x 8′ length x 10′ height
(2) Side Closed
(2) End Closed
(1) Bay Opening
(1) 6′ x 7′ Roll-up Door
(1) 34″ x 72″ Walk-in Door

A-frame Vertical
Carport: 12′ width x 16′ length x 10′ height

Utility Building B

Round
Room: 22′ width x 4′ length x 8′ height
(2) Side Closed
(2) End Closed
(1) 6′ x 7′ Roll-up Door

Round
Carport: 22′ width x 22′ length x 8′ height
(1) Gable End
Extra Bracing

Utility Building C

Round
Room: 12′ width x 12′ length x 6′ height
(2) Side Closed
(2) End Closed
(1) 34″ x 72″ Walk-in Door

Round
Carport: 12′ width x 8′ length x 6′ height

Utility Building D

A-frame Vertical
Room: 20′ width x 10′ length x 9′ height
(2) Side Closed
(2) End Closed
(1) 6′ x 7′ Roll-up Door

A-frame Vertical
Carport: 20′ width x 20′ length x 9′ height
(1) Gable End
Extra Bracing

Utility Building E

Round
Room: 26′ width x 44′ length x 13′ height
(2) Side Closed
(2) End Closed
(2) Bay Openings
(2) 10′ x 12′ Roll-up Doors
Extra Braces

Round
Carport: 26′ width x 12′ length x 13′ height
(1) Side Closed
(1) Bay Opening
(1) Extra Panel
Extra Bracing

Utility Building F

A-frame Horizontal
Room: 12′ width x 4′ length x 8′ height
(2) Side Closed
(2) End Closed
(1) 8′ x 7′ Roll-up Door

A-frame Horizontal
Carport: 12′ width x 16′ length x 8′ height
(1) Gable End
(1) Extra Panel
Extra Bracing

Customer Testimonials

Just wanted to thank you guys for doing a fantastic job. The installers were in and out. They made sure everything was done right before heading out. I’m very pleased with my new garage. Keep up the good work! – Glass

Guys came did a fantastic job. Worked fast and efficiently. Wanted to thank you personally nice doing business with you. – Frank

Thank you very much, the guys did a great job. Very nice and very fast! Thank you again! – Dennis

Office Hours

Monday………… 8:30am – 5:00pm
Tuesday……….. 8:30am – 5:00pm
Wednesday…… 8:30am – 5:00pm
Thursday……… 8:30am – 5:00pm
Friday………….. 8:30am – 5:00pm
Saturday…….. 8:30am – 12:30pm

Site Preparation

Site preparation is very important for a good installation. As a reminder we are not responsible for any site prep. Below are a few steps that will help with building install:

Check for underground lines, where anchoring will take place.

Land must be squared and leveled. Call for more details.

Minimum workspace of 2 ft around entire structure.

When overhead power lines are involved, a minimum of 10 ft is needed or power lines must be completely shut off.