A-frame Vertical
Room: 12′ width x 8′ length x 10′ height
(2) Side Closed
(2) End Closed
(1) Bay Opening
(1) 6′ x 7′ Roll-up Door
(1) 34″ x 72″ Walk-in Door
A-frame Vertical
Carport: 12′ width x 16′ length x 10′ height
Round
Room: 22′ width x 4′ length x 8′ height
(2) Side Closed
(2) End Closed
(1) 6′ x 7′ Roll-up Door
Round
Carport: 22′ width x 22′ length x 8′ height
(1) Gable End
Extra Bracing
Round
Room: 12′ width x 12′ length x 6′ height
(2) Side Closed
(2) End Closed
(1) 34″ x 72″ Walk-in Door
Round
Carport: 12′ width x 8′ length x 6′ height
A-frame Vertical
Room: 20′ width x 10′ length x 9′ height
(2) Side Closed
(2) End Closed
(1) 6′ x 7′ Roll-up Door
A-frame Vertical
Carport: 20′ width x 20′ length x 9′ height
(1) Gable End
Extra Bracing
Round
Room: 26′ width x 44′ length x 13′ height
(2) Side Closed
(2) End Closed
(2) Bay Openings
(2) 10′ x 12′ Roll-up Doors
Extra Braces
Round
Carport: 26′ width x 12′ length x 13′ height
(1) Side Closed
(1) Bay Opening
(1) Extra Panel
Extra Bracing
A-frame Horizontal
Room: 12′ width x 4′ length x 8′ height
(2) Side Closed
(2) End Closed
(1) 8′ x 7′ Roll-up Door
A-frame Horizontal
Carport: 12′ width x 16′ length x 8′ height
(1) Gable End
(1) Extra Panel
Extra Bracing
Customer Testimonials
Just wanted to thank you guys for doing a fantastic job. The installers were in and out. They made sure everything was done right before heading out. I’m very pleased with my new garage. Keep up the good work! – Glass
Guys came did a fantastic job. Worked fast and efficiently. Wanted to thank you personally nice doing business with you. – Frank
Thank you very much, the guys did a great job. Very nice and very fast! Thank you again! – Dennis
Office Hours
Monday………… 8:30am – 5:00pm
Tuesday……….. 8:30am – 5:00pm
Wednesday…… 8:30am – 5:00pm
Thursday……… 8:30am – 5:00pm
Friday………….. 8:30am – 5:00pm
Saturday…….. 8:30am – 12:30pm
Site Preparation
Site preparation is very important for a good installation. As a reminder we are not responsible for any site prep. Below are a few steps that will help with building install:
Check for underground lines, where anchoring will take place.
Land must be squared and leveled. Call for more details.
Minimum workspace of 2 ft around entire structure.
When overhead power lines are involved, a minimum of 10 ft is needed or power lines must be completely shut off.