A-Frame Vertical
20′ width x 25′ length x 10′ height
(2) Ends Closed
(2) Sides Closed
(1) 10′ x 8′ Roll-up Door
(1) 1 Window
(1) Man Door
Extra Braces
Round
18′ width x 21′ length x 8′ height
(2) Ends Closed
(2) Sides Closed
(1) 6′ x 7′ Roll-up Door
(1) 34″ x 72″ Walk-in Door
(4) Windows
Extra Braces
Round
12′ width x 21′ length x 7′ height
(2) Ends Closed
(2) Sides Closed
(1) 6′ x 7′ Roll-up Door
Extra Braces
A-frame Vertical
12′ width x 12′ length x 9’/7′ height
(2) Ends Closed
(2) Sides Closed
(1) 6′ x 7′ Roll-up Door
(1) 6′ X 7′ Bay Opening
(1) 34″ x 72″ Walk-in Door
(1) Window
Extra Braces
A-frame Horizontal
12′ width x 16′ length x 9′ height
(2) Ends Closed
(2) Sides Closed
(1) 6′ x 7′ Roll-up Door W/ Bayopening
(2) Windows
Extra Braces
Customer Testimonials
Just wanted to thank you guys for doing a fantastic job. The installers were in and out. They made sure everything was done right before heading out. I’m very pleased with my new garage. Keep up the good work! – Glass
Guys came did a fantastic job. Worked fast and efficiently. Wanted to thank you personally nice doing business with you. – Frank
Thank you very much, the guys did a great job. Very nice and very fast! Thank you again! – Dennis
Office Hours
Monday………… 8:30am – 5:00pm
Tuesday……….. 8:30am – 5:00pm
Wednesday…… 8:30am – 5:00pm
Thursday……… 8:30am – 5:00pm
Friday………….. 8:30am – 5:00pm
Saturday…….. 8:30am – 12:30pm
Site Preparation
Site preparation is very important for a good installation. As a reminder we are not responsible for any site prep. Below are a few steps that will help with building install:
Check for underground lines, where anchoring will take place.
Land must be squared and leveled. Call for more details.
Minimum workspace of 2 ft around entire structure.
When overhead power lines are involved, a minimum of 10 ft is needed or power lines must be completely shut off.